Some plumbing activity occured also, and installation oft the kitchen hood ducting piping.
Here's the first toilet run, from the ensuite upstairs.
Here's the kitchen hood ducting, running through into the alfresco. It will eventually be ported out through the alfresco roof tiles.
Here's the main bathroom. Double outlets for the dual sink, and floor waste installed.
This the ensuite plumbing.
Here's the termite guard stuff. It is poured into the cavity between the brick and the retaining board at ground level.
The above is apparently called Granitguard, and details are shown below, and details are at http://www.granitgard.com.au/